Instagram.

Notting Hill Lateral
W2

HvB carried out the full refurbishment of this unmodernised first floor apartment within a period building.

HvB fully modernised the home to the client’s specification with works including structural changes, reconfiguration of floorplans, increasing ceiling height, flooring, bathrooms, kitchen, finishes, full mechanical and electrical engineering including underfloor heating and technology throughout.

Working across west london’s prime residential locations including
Belgravia
Chelsea
Kensington
Knightsbridge
Mayfair
Notting Hill
+
More

Enquire now